How to Permit for Solar/PV Systems

12/19/2024

0 Comments

 
Permit process in ePermitting:
  1. Applicant applies for a Commercial or Residential Structural permit, they will be required to enter the submitted job value for the project (note, this valuation entry may or may not be considered ultimately depending on the install type – prescriptive or non-prescriptive).

  2. Category of Construction (CoC) would be the structure type the system is being installed to. The Type of Work (ToW) would be related to the structure’s status – if the structure is being newly constructed, Type of Work = New – but if the structure already exists, Type of Work = Alteration (and if the system is being installed along with a newly constructed addition, then Type of Work = Addition). Solar is not considered as ‘Other’ under CoC or under ToW.

  3. Fees – fees will be automated for a standard Structural permit based on the submitted job value that was provided by the Applicant. Automated NEW fees should be reviewed and assessed based on the Solar/PV system type.

    1. If the system type is non-prescriptive, all automated fees should be selected and deleted. Then, go to Fees > ADD > add ‘1’ each of Non-Prescriptive Photovoltaic fee and ‘1’ each of Structural Plan Review > Submit. The system will add the Non-Prescriptive Photovoltaic fee item, Structural Plan Review, and State Surcharge – the fees for non-prescriptive systems are valuation-based structural fees, just like the standard structural permit fees, but using the named fee in this case assists greatly in reporting, specifically on solar install data.

    2. If the system type is prescriptive, all automated fees should be selected and deleted. Then, go to Fees > ADD > add ‘1’ each of Prescriptive Photovoltaic fee > Submit. The system will add the Prescriptive Photovoltaic fee item and State Surcharge – the Prescriptive Photovoltaic fee already includes plan review, so plan review is not separately charged with this system type. Use of this required named fee again assists greatly in reporting, specifically on solar install data.

  4. Plan Review and Issuance – both prescriptive and non-prescriptive qualifying installs both require plans to be reviewed. Workflow is initiated as with any other structural application, moved though plan review to Completeness task. Issuance fees are collected at issuance and the permit is issued.

  5. Inspections – appropriate and required inspections are then scheduled by the Applicant and inspected. Once final inspection is approved – the permit is finaled. No Certificate of Occupancy (COO) is indicated for Solar/PV installs – however, a Certificate of Satisfactory Completion (CSC) is best practice and can be very helpful in providing formal documentation that the install project has met requirements and is complete.  Go to Summary tab > Reports dropdown > generate the CSC – this report will automatically attach to the record Documents tab. The Applicant or other parties associated to the permit are then able to download the CSC report, or any other attached documents, online through ACA at BuildingPermits.Oregon.gov.

Follow this link for more information: https://orepermittinghelp.kayako.com/article/163-how-to-permit-for-solar-pv-installs.
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    Disclaimer

    Please be aware that this content is relevant at the time it is published, but as time goes on may become out-of-date. We will do our best to keep the content alive and relevant.

    Archives

    December 2024
    August 2024
    June 2024
    January 2024
    August 2023
    April 2023
    March 2023
    December 2022
    October 2022
    August 2022
    May 2022
    April 2022
    March 2022
    January 2022
    August 2021
    March 2021
    January 2021
    July 2020
    April 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    August 2019
    June 2019
    April 2019
    January 2019
    November 2018
    October 2018
    September 2018
    August 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017

    Categories

    All
    In The Spotlight
    Online Training
    OSM Best Practice
    OSM Changes
    OSM Future Implementations
    Projects
    Reminders
    Tips And Tricks
    What's New

    RSS Feed

Jurisdiction Resources

ePermitting Knowledgebase
Register for ePermitting Brochure
Inspection Codes Brochure
Modelo Estandar de Oregon Codigos de inspeccion
SelecTXT Brochure
IVR Call Flow Brochure Insert
End of Day Report
ePermitting Advertising Business Cards
​Building Department Directory

Participating Jurisdictions
​​
© COPYRIGHT 2019. ALL RIGHTS RESERVED.